Reports & Documents
The intent of the Cross Bronx Bridges rehabilitation and replacement project, along the roughly one-mile-long section between Boston Road and Rosedale Avenue, is to modernize the five structures, enhance safety within the project limits, and improve transportation options along the corridor.
The project will either rehabilitate or replace the aging structures to meet today’s engineering standards. Additional needs identified within the project limits include improving the vehicular connections between the southbound Bronx River Parkway and the westbound CBE, enhancing safety along the CBE and providing improved access to public transportation, as well as providing new pedestrian and bicycle connections between the communities on both sides of the Bronx River.
An Environmental Assessment (EA) is currently being prepared for the project. The EA was initiated in September 2024. Once complete, it will be posted to this page.
- Original Design Report (January 201/may-2025-information-sheet-spanish8)
- Appendices to the Original Design Report (January 2018)
- Reevaluation Statement 1 (December 2020)
- Reevaluation Statement 2 (December 2020)
- Draft NEPA Public Involvement Plan (July 2025)
- Draft Environment Justice Public Engagement Plan (December 2024)
- Project Study Area and Location Map (December 2024)
- August 2025 Information Sheet
- Hoja informativa de Agosto de 2025