The intent of the Cross Bronx Bridges rehabilitation and replacement project, along the roughly one-mile-long section between Boston Road and Rosedale Avenue, is to modernize the five structures, enhance safety within the project limits, and improve transportation options along the corridor.
The project will either rehabilitate or replace the aging structures to meet today’s engineering standards. Additional needs identified within the project limits include improving the vehicular connections between the southbound Bronx River Parkway and the westbound CBE, enhancing safety along the CBE and providing improved access to public transportation, as well as providing new pedestrian and bicycle connections between the communities on both sides of the Bronx River.
Public Information Meeting Material
Public Hearing Material
Notice of Availability
Draft Design Report / National Environmental Policy Act (NEPA) Environmental Assessment
State Environmental Quality Review Act (SEQRA) Environmental Assessment
Executive Summary
For an overall summary of the Draft Design Report / National Environmental Policy Act (NEPA) Environmental Assessment, the Executive Summary is available in both English and Spanish Languages
Appendices
Additional Reports & Documents
- Original Design Report (January 201/may-2025-information-sheet-spanish8)
- Appendices to the Original Design Report (January 2018)
- Reevaluation Statement 1 (December 2020)
- Reevaluation Statement 2 (December 2020)
- Draft NEPA Public Involvement Plan (July 2025)
- Draft Environment Justice Public Engagement Plan (December 2024)
- Project Study Area and Location Map (December 2024)
- December 2025 Information Sheet
- Hoja informativa de Deciembre de 2025